1 |
Regulation for renewable energy development: Lessons from Sri Lanka experience Wijayatunga PDC Renewable Energy, 61, 29, 2014 |
2 |
Avoided cost estimation and cost-effectiveness of permanent load shifting in California Sreedharan P, Miller D, Price S, Woo CK Applied Energy, 96, 115, 2012 |
3 |
국내 초임계 석탄화력발전소에 연소 후 CO2 포집공정 설치 시 성능 및 경제성 평가 이지현, 곽노상, 이인영, 장경룡, 심재구 Korean Chemical Engineering Research, 50(2), 365, 2012 |
4 |
Capital costs and energy considerations of different alternative stripper configurations for post combustion CO2 capture Karimi M, Hillestad M, Svendsen HF Chemical Engineering Research & Design, 89(8A), 1229, 2011 |
5 |
Industrial test and techno-economic analysis of CO2 capture in Huaneng Beijing coal-fired power station Huang B, Xu SS, Gao SW, Liu LB, Tao JY, Niu HW, Cai M, Cheng JA Applied Energy, 87(11), 3347, 2010 |
6 |
Pricing of embedded generation: Incorporation of exernalities and avoided network losses Rodrigo AS, Wijayatunga PDC Energy Conversion and Management, 48(8), 2332, 2007 |
7 |
Incentive pricing and economic profitability of load management program Sheen JN Energy, 31(12), 2193, 2006 |
8 |
Economic profitability analysis of demand side management program Sheen JN Energy Conversion and Management, 46(18-19), 2919, 2005 |