화학공학소재연구정보센터
검색결과 : 10건
No. Article
1 Daily peak shaving operation of cascade hydropower stations with sensitive hydraulic connections considering water delay time
Liao SL, Liu ZW, Liu BX, Cheng CT, Wu XY, Zhao ZP
Renewable Energy, 169, 970, 2021
2 Cascade hydropower plants operation considering comprehensive ecological water demands
Zhang HX, Chang JX, Gao C, Wu HS, Wang YM, Lei KX, Long RH, Zhang LP
Energy Conversion and Management, 180, 119, 2019
3 An improved risk-benefit collaborative grey target decision model and its application in the decision making of load adjustment schemes
Li RB, Jiang ZQ, Ji CM, Li AQ, Yu S
Energy, 156, 387, 2018
4 Parallel chance-constrained dynamic programming for cascade hydropower system operation
Liu BX, Cheng CT, Wang S, Liao SL, Chau KW, Wu XY, Li WD
Energy, 165, 752, 2018
5 Optimal operation of cascade hydropower stations using hydrogen as storage medium
Lu D, Wang BD, Wang YD, Zhou HC, Liang QH, Peng Y, Roskilly T
Applied Energy, 137, 56, 2015
6 Optimal operation rules of Three-gorge and Gezhouba cascade hydropower stations in flood season
Mu J, Ma C, Zhao JQ, Lian JJ
Energy Conversion and Management, 96, 159, 2015
7 Research on a layered coupling optimal operation model of the Three Gorges and Gezhouba cascade hydropower stations
Chen J, Zhong PA, Zhao YF
Energy Conversion and Management, 86, 756, 2014
8 Short-term optimal operation of Three-gorge and Gezhouba cascade hydropower stations in non-flood season with operation rules from data mining
Ma C, Lian JJ, Wang JN
Energy Conversion and Management, 65, 616, 2013
9 A future role for cascade hydropower in the electricity system of China
Tang XH, Zhou JJ
Energy Policy, 51, 358, 2012
10 The critical scale and section management of cascade hydropower exploitation in Southwestern China
Fang YP, Deng W
Energy, 36(10), 5944, 2011