1 |
Risk of penstock fatigue in pumped-storage power plants operating with variable speed in pumping mode Martinez-Lucas G, Perez-Diaz JI, Chazarra M, Sarasua JI, Cavazzini G, Pavesi G, Ardizzon G Renewable Energy, 133, 636, 2019 |
2 |
Economic viability of pumped-storage power plants participating in the secondary regulation service Chazarra M, Perez-Diaz JI, Garcia-Gonzalez J, Praus R Applied Energy, 216, 224, 2018 |
3 |
Contribution of a pumped-storage hydropower plant to reduce the scheduling costs of an isolated power system with high wind power penetration Perez-Diaz JI, Jimenez J Energy, 109, 92, 2016 |
4 |
Approximate formulae for the assessment of the long-term economic impact of environmental constraints on hydropeaking Guisandez I, Perez-Diaz JI, Wilhelmi JR Energy, 112, 629, 2016 |
5 |
Dynamic response and governor tuning of a long penstock pumped-storage hydropower plant equipped with a pump-turbine and a doubly fed induction generator Sarasua JI, Perez-Diaz JI, Wilhelmi JR, Sanchez-Fernandez JA Energy Conversion and Management, 106, 151, 2015 |
6 |
Assessment of the economic impact of environmental constraints on annual hydropower plant operation Guisandez I, Perez-Diaz JI, Wilhelmi JR Energy Policy, 61, 1332, 2013 |
7 |
Contribution of re-regulation reservoirs considering pumping capability to environmentally friendly hydropower operation Perez-Diaz JI, Millan R, Garcia D, Guisandez I, Wilhelmi JR Energy, 48(1), 144, 2012 |
8 |
Optimal short-term operation schedule of a hydropower plant in a competitive electricity market Perez-Diaz JI, Wilhelmi JR, Arevalo LA Energy Conversion and Management, 51(12), 2955, 2010 |
9 |
Assessment of the economic impact of environmental constraints on short-term hydropower plant operation Perez-Diaz JI, Wilhelmi JR Energy Policy, 38(12), 7960, 2010 |
10 |
Analysis of a degenerate obstacle problem on an unbounded set arising in the environment Diaz JI, Faghloumi C Applied Mathematics and Optimization, 45(3), 251, 2002 |