화학공학소재연구정보센터
검색결과 : 61건
No. Article
1 Effect of internal helical-rib roughness on mixed convection flow and heat transfer in heated horizontal pipe flow of supercritical water
Li ZH, Yao YC, Wang QG, Cai JY, Wu YX, Wang H
International Journal of Heat and Mass Transfer, 130, 1272, 2019
2 Removal kinetics of sulfamethazine and its transformation products formed during treatment using a horizontal flow-anaerobic immobilized biomass bioreactor
Oliveira CA, Penteado ED, Tomita IN, Santos-Neto AJ, Zaiat M, da Silva BF, Gomes PCFL
Journal of Hazardous Materials, 365, 34, 2019
3 The efficiency and technological reliability of biogenic compounds removal during long-term operation of a one-stage subsurface horizontal flow constructed wetland
Jozwiakowski K, Bugajski P, Kurek K, de Carvalho MDN, Almeida MAA, Siwiec T, Borowski G, Czekala W, Dach J, Gajewska M
Separation and Purification Technology, 202, 216, 2018
4 Phosphate removal in constructed wetland with rapid cooled basic oxygen furnace slag
Park JH, Wang JJ, Kim SH, Cho JS, Kang SW, Delaune RD, Seo DC
Chemical Engineering Journal, 327, 713, 2017
5 Numerical modelling of a direct contact condensation experiment using the AIAD framework
Hohne T, Gasiunas S, Seporaitis M
International Journal of Heat and Mass Transfer, 111, 211, 2017
6 A study of heat transfer scaling of supercritical pressure water in horizontal tubes
Lei XL, Li HX, Dinh N, Zhang WQ
International Journal of Heat and Mass Transfer, 114, 923, 2017
7 Reliability and efficiency of pollution removal during long-term operation of a one-stage constructed wetland system with horizontal flow
Jozwiakowski K, Bugajski P, Mucha Z, Wojcik W, Jucherski A, Nastawny M, Siwiec T, Mazur A, Obroslak R, Gajewska M
Separation and Purification Technology, 187, 60, 2017
8 Community-Level Physiological Profiling of Microbial Communities in Constructed Wetlands: Effects of Sample Preparation
Button M, Weber K, Nivala J, Aubron T, Muller RA
Applied Biochemistry and Biotechnology, 178(5), 960, 2016
9 Surfactants and personal care products removal in pilot scale horizontal and vertical flow constructed wetlands while treating greywater
Ramprasad C, Philip L
Chemical Engineering Journal, 284, 458, 2016
10 Removal of saccharin from municipal sewage: The first results from constructed wetlands
Vymazal J, Brezinova TD
Chemical Engineering Journal, 306, 1067, 2016