검색결과 : 2건
No. | Article |
---|---|
1 |
De-emphasize Capital Costs For Pipe Size Selection (vol 116, pg 41, 2009) Narang R, Sarin S, George AA Chemical Engineering, 117(4), 6, 2010 |
2 |
De-emphasize Capital Costs For Pipe Size Selection Narang R, Sarin S, George AA Chemical Engineering, 116(12), 41, 2009 |