1 |
Membrane separation system for coal-fired flue gas reclamation: Process planning and initial design Ruan XH, Xiao HY, Shou JX, Huang AB, Xiao W, He GH Canadian Journal of Chemical Engineering, 97(3), 717, 2019 |
2 |
Closed-loop integration of planning, scheduling and multi-parametric nonlinear control Charitopoulos VM, Papageorgiou LG, Dua V Computers & Chemical Engineering, 122, 172, 2019 |
3 |
Distributionally robust optimization for planning and scheduling under uncertainty Shang C, You FQ Computers & Chemical Engineering, 110, 53, 2018 |
4 |
A life cycle energy analysis integrated process planning approach to foster the sustainability of discrete part manufacturing Guo YS, Duflou JR, Deng YL, Lauwers B Energy, 153, 604, 2018 |
5 |
Modular Chemical Reactors for Process Development and Production in Continuously Operated Multipurpose Plants Kockmann N Chemie Ingenieur Technik, 87(9), 1173, 2015 |
6 |
Optimal design and planning of heap leaching process. Application to copper oxide leaching Trujillo JY, Cisternas LA, Galvez ED, Mellado ME Chemical Engineering Research & Design, 92(2), 308, 2014 |
7 |
A Graph-based Ant Colony Optimization Approach for Integrated Process Planning and Scheduling Wang JF, Fan XL, Zhang CW, Wan ST Chinese Journal of Chemical Engineering, 22(7), 748, 2014 |
8 |
Expected energy analysis for industrial process planning problem with fuzzy time parameters Tian GD, Chu JW, Liu YM, Ke H, Zhao X, Xu G Computers & Chemical Engineering, 35(12), 2905, 2011 |
9 |
A time optimized process planning system for mold/die polishing Wang JJJ, Wu BH, Hou JK Materials Science Forum, 505-507, 499, 2006 |
10 |
On the scheduling of leak detection personnel Chmielewski DJ, Agrawal T Computers & Chemical Engineering, 28(3), 417, 2004 |