검색결과 : 21건
No. | Article |
---|---|
1 |
Optimization of Large Gas Pipeline Network-A Case Study in China Jin L, Wojtanowicz AK Journal of Canadian Petroleum Technology, 49(4), 36, 2010 |
2 |
An Analytical Model for Water Coning Control Installation in Reservoir With Bottomwater Jin L, Wojtanowicz AK, Hughes RG Journal of Canadian Petroleum Technology, 49(5), 65, 2010 |
3 |
Performance Analysis of Wells With Downhole Water Loop Installation for Water Coning Control Jin L, Wojtanowicz AK Journal of Canadian Petroleum Technology, 49(6), 38, 2010 |
4 |
Scaling Analysis of Wells With Downhole Water Loop Completion for Bottomwater Control Jin L, Wojtanowicz AK, Afonja G, Li W Journal of Canadian Petroleum Technology, 49(11), 81, 2010 |
5 |
Maximum revenue for oilwells with optimized downhole water drainage Arslan O, White CD, Wojtanowicz AK Journal of Canadian Petroleum Technology, 47(5), 56, 2008 |
6 |
Prediction of bypassed oil with correlations in side-water drive reservoirs Hernandez JC, Wojtanowicz AK Journal of Canadian Petroleum Technology, 45(7), 16, 2006 |
7 |
West Delta Block 84 - Methodology and analysis of a previously orphaned field Kimbrell WC, Wojtanowicz AK Journal of Canadian Petroleum Technology, 45(8), 48, 2006 |
8 |
Desian of cement pulsation treatment in gas wells-model and field validation Chimmalgi VS, Wojtanowicz AK Journal of Canadian Petroleum Technology, 44(6), 36, 2005 |
9 |
Incremental recovery using dual completed wells in gas reservoirs with bottom water drive: A feasibility study Armenta M, Wojtanowicz AK Journal of Canadian Petroleum Technology, 44(6), 53, 2005 |
10 |
Dual gas lift in wells with downhole water sink completions Marcano L, Wojtanowicz AK Journal of Canadian Petroleum Technology, 44(12), 49, 2005 |