화학공학소재연구정보센터

Journal of Petroleum Technology

Journal of Petroleum Technology, Vol.49, No.10 Entire volume, number list
ISSN: 0149-2136 (Print) 

In this Issue (19 articles)

1068 - 1068 Changing Perspectives
Craig D
1070 - 1070 Changing Perspectives - Comment
Pike WJ
1075 - 1075 Fields of Vision
Millheim KK
1089 - 1089 Innovative Remote-Controlled Completion
Botto G, Giuliani C, Maggioni B, Rubbo R
1093 - 1095 Deep-Water, Remotely Actuated Completions for the 21st-Century
Smith MV, Lowe EE, Coull C
1096 - 1096 Automatic Welding and Ultrasonic Inspection
Kopp F, Perkins GG, Laing BS, Prentice G, Springmann SP, Stevens DM
1101 - 1102 Testing a Lower-Cost Remote-Control System
Loth WD, Jacobs M
1103 - 1104 Meeting Deep-Water Subsea-Completion Design Challenges
Aldridge D, Dodd P
1105 - 1111 Real Savings from a Life-Cycle Management Approach
Crompton J, Boyd T, Lopez T
1112 - 1114 Underground-Storage Operations
Knepper GA
1115 - 1116 Economic in-Place Casing Lining and Repair
King GE, Vloedman J, Ford G, Westermark R
1117 - 1117 Field Application of in-Situ Gravity Segregation to Remediate Prior Water Coning
Bowlin KR, Chea CK, Wheeler SS, Waldo LA
1122 - 1124 Steam-Assisted Gravity-Drainage and Vapex Process Reservoir Screening
Singhal AK, Das SK, Leggitt SM, Kasraie M, Ito Y
1125 - 1126 Cold Production of Heavy Oil
Huang W, Marcum B, Chase M, Yu C
1127 - 1128 Deployment of a Coiled-Tubing Gas-Lift Completion
Smith MI, Brown R
1129 - 1130 Exploiting the Mature South El-Morgan-Kareem Reservoir - A Case-Study in Multidiscipline
Hughes SC, Ahmed H, Raheem TA
1132 - 1133 A Specially Formulated Fracturing Fluid to Improve Water Injectivity in Ultra-Deep Wells
Cui M, Jin L, Wang ZD, Zhao ZY, Yuan WX, Li Y, Dai ZY
1134 - 1135 Reservoir Management of the Oseberg Field During 8 Years of Production
Sognesand S
1136 - 1138 Profile Modification in Horizontal Slotted Liners
Bond A, Blount C, Davies S, Keese R, Lai Q, Loveland K