화학공학소재연구정보센터

Hydrocarbon Processing

Hydrocarbon Processing, Vol.89, No.5 Entire volume, number list
ISSN: 0018-8190 (Print) 

In this Issue (25 articles)

7 - 7 Untitled
Thinnes B
7 - 7 Untitled
Thinnes B
7 - 7 Untitled
Thinnes B
7 - 7 Fallout from Tesoro accident
Thinnes B
7 - 7 Untitled
Thinnes B
7 - 7 Untitled
Thinnes B
9 - 9 Repetitive pump seal failures can cause disasters
Bloch HP
11 - 11 Procedural automation improves process plant performance
O'Brien L
13 - 13 Fossil fuels still meet energy needs of the world
Thinnes B
15 - 16 Responding to oil supply emergencies
Thinnes B
15 - 15 Underground gas storage on the rise
Thinnes B
16 - 16 Refiners in a tough market
[Anonymous]
19 - 19 Medium voltage motor drives sales projected to decline in 2010
[Anonymous]
27 - 27 Flow-induced fatigue failure in tubular heat exchangers Case histories describe a variety of failures and solutions
Babakr A, Ashiru T, Westhuizen C
35 - 35 Purging and inerting large-volume tankage and equipment-jet mixing concept-Part 1 Here are the advantages and disadvantages of the various methods
Gollin M
43 - 43 Heat-exchanger failure analysis in a naphtha cracking unit This case history analyzed the failure and makes recommendations to prevent future failures
Sababi M, Mazuchi M, Monemian SA
49 - 51 Oil-mist lubrication for fin-fan shafts Tests show it is superior to grease lubrication
Duncan PW
53 - 57 Fundamental changes coming in Asia's petrochemical industry Massive new processing additions will impact operations in this region as well as in the global market
Kumar P, Zhang L
59 - 65 Establishing safety representatives who are effective Follow these protocols for a safer workplace
Alevizos G
67 - 73 Consider CFD analysis to support critical separation operations This modeling method can help eliminate chronic problems caused by feed mal-distribution and poorly designed feed devices
Remesat D, Riha Z
74 - 77 Strategize preshutdown work to enhance productivity Adopt these principles from a refinery revamp project
Kumar A
78 - 82 Implementing a suitable safety instrumented system-Part 1 The "analysis phase" is the most important step for engineering and designinga suitable system
Modi R
95 - 95 Case 56: Quick troubleshooting of shaft failures Some simple calculations can guide the way to improved performance
Sofronas T
102 - 102 What's happening with the Legionella Standard?-Part 1
Huchler LA
S85 - S87 Design your sulfur facility with market uncertainty in mind These strategies can effectively deliver sulfur to the marketplace
Crawford P