화학공학소재연구정보센터
Power, Vol.145, No.5, 24-24, 2001
Root-cause analysis gets to the bottom of it
When a pump bearing at an Alabama Power Co plant railed five times in a six-month period, something other than "repair in-kind" was needed This time, asset managers put together a root-cause analysis team, and tracked down the fundamental problem. Hint: It had nothing to do with mechanics.