화학공학소재연구정보센터
Process Safety Progress, Vol.21, No.3, 205-211, 2002
Fire in secondary reformer outlet line to waste heat boiler
This paper describes the failure of the pressure shell of an interconnecting pipe between the secondary reformer and primary waste heat boiler that led to afire in Ammonia Unit I after 13 and-a half years of operation The fire incident resulted at KRIBHCO in a plant shutdown of 15 days It also describes analysis, the repair work carried out to put the plant back in service in the least possible time, and the remedial measures taken.