화학공학소재연구정보센터
Journal of Petroleum Technology, Vol.47, No.10, 879-883, 1995
Monobore Completions and Novel Wireline Perforating of High-Angle Wells in the Nelson Field
The Nelson field gas-lift completions were designed to optimize production, enhance safety and reliability, and minimize well-maintenance costs. The completions are of a near-monobore design and include an annular safety system, which is regarded as a major safety benefit during gas lift. The single-trip completions were batch installed in eight high-angle (up to 70 degrees) predrilled wells. This paper presents details of the completion design and the approach taken to planning and installing the completions. The paper also describes the use of a novel technique for perforating the platform wells with wireline guns.