Journal of Industrial and Engineering Chemistry, Vol.93, 315-321, January, 2021
Hydrometallurgical processing of waste integrated circuits (ICs) to recover Ag and generate mix concentrate of Au, Pd and Pt
E-mail:
Present research reports a novel and feasible process to recover Ag and generate concentrate of precious metals (Au, Pd and Pt) from waste ICs present in PCBs of computers. Initially, depopulated ICs were pulverized and beneficiated to obtain metallic concentrate, which contained (per ton) 7 Kg Ag, 5 Kg Au, 110 g Pd and 4 g Pt along with Cu, Pb, Fe and Ni. Leaching was carried out and found that at optimized condition i.e. 3M HNO3, temperature 80 °C, pulp density 50 g/L and mixing time 1h, >90% of Ag, Cu, Pb and Ni were leached leaving Au, Pt and Pd in the residue. From the leach liquor, Ag was precipitated using 1M KCl in 30 min and other metals were recovered by precipitation, solvent extraction and cementation methods. All wastes (solid/ liquid) generated during process development could be treated using standard environmental procedure.
- Panda R, Jha MK, Pathak DD, Journal of Metallurgy and Materials Science, 61 (4), 213 (2019).
- Khaliq A, Rhamdhani MA, Brooks G, Masood S, Resources, 3, 152 (2014)
- Robinson BH, Sci. Total Environ., 408, 183 (2009)
- Dehchenari MA, Hosseinpoor S, Aali R, Iran NS, Mehdipour M, Environ-mental Health Engineering and Management Journal, 4 (1), 55 (2017).
- Panda R, Jha MK, Dinkar OS, Pathak DD, The Minerals, Metals & Materials Society 2020, pp.243 (2020).
- Tatariants M, Yousef S, Denafas G, Tichonovas M, Bendikiene R, J. Clean Prod., 172, 2811 (2018)
- Das A, Vidyadhar A, Mehrotra SP, Resour. Conserv. Recycl., 53, 464 (2009)
- Ajiboye EA, Panda PK, Adebayo AO, Ajayia OO, Tripathy BC, Ghosh MK, Basu S, Hydrometallurgy, 188, 161 (2019)
- Kumari A, Jha MK, Singh RP, Hydrometallurgy, 165, 97 (2016)
- Jeon S, Ito M, Tabelin CB, Pongsumrankul R, Kitajima N, Park I, Hiroyoshi N, Waste Manage., 77, 195 (2018)
- Jeon S, Ito M, Tabelin CB, Pongsumrankul R, Tanaka S, Kitajima N, Saito A, Park I, Hiroyoshi N, Miner. Eng., 138, 168 (2019)
- Cayumil R, Khanna R, Rajarao R, Mukherjee PS, Sahajwalla V, Waste Manage., 57, 121 (2016)
- Phengsaart T, Ito M, Hamaya N, Tabelin CB, Hiroyoshi N, Miner. Eng., 129, 54 (2018)
- Meng L, Guo L, Zhong Y, Wang Z, Chen K, Guo Z, Waste Manage., 82, 147 (2018)
- Park HS, Kim YJ, J. Hazard. Mater., 365, 659 (2019)
- Gamez S, Garces K, Torre E, Guevara A, Hydrometallurgy, 186, 1 (2019)
- Jeon S, Tabelin CB, Park I, Nagata Y, Ito M, Hiroyoshi N, Hydrometallurgy, 191, 105214 (2020)
- Jeon S, Tabelin CB, Takahashi H, Park I, Ito M, Hiroyoshi N, Hydrometallurgy, 191, 105165 (2020)
- Jeon S, Tabelin CB, Takahashi H, Park I, Ito M, Hiroyoshi N, Waste Manage., 81, 148 (2018)
- Rebello RZ, Lima MTWDC, Yamane LH, Siman RR, Resour. Conserv. Recycl., 153, 104557 (2020)
- Liu Y, Zhang L, Song Q, Xua Z, J. Hazard. Mater., 388, 122008 (2020)
- Choubey PK, Panda R, Jha MK, Lee JC, Pathak DD, Sep. Purif. Technol., 156, 269 (2015)
- Schosseler J, Trentmann A, Friedrich B, Hahn K, Wotruba H, Metals, 9, 187 (2019)
- Timur S, Cetinkaya O, Erturk S, Orhan G, Miner. Metall. Process., 22(4), 205 (2005)
- Kinney PJ, An infrared study of the tributyl phosphate-nitric acid-water solvent extraction system (1963).
- Panda R, Dinkar OS, Jha MK, Pathak DD, Gold Bulletin, 53, 11 (2020)
- Jha MK, Kumari A, Choubey PK, Lee JC, Kumar V, Jeong J, Hydrometallurgy, 121-124, 28 (2012)
- Vogel AI, Vogel’s Qualitative Inorganic Analysis, 7th edition, Revised by Svehla, G., 311 Pearson Education Ltd, 1996.