화학공학소재연구정보센터
Applied Energy, Vol.65, No.1-4, 29-43, 2000
Predicted and actual productions of horizontal wells in heavy-oil fields
This paper discusses the comparison of predicted and actual cumulative and daily oil production. The predicted results were obtained from the use of Joshi's equation, wherein, the effects of anisotropy and eccentricity were included. The cumulative production obtained from the use of equations developed by Borisov, Giger, Renard and Dupuy resulted in errors in excess of 100%, thus, they were not considered applicable for predicting cumulative and daily flows of heavy oils in horizontal wells. The wells considered in this analysis varied from 537 to 1201 metres with corresponding well bores of 0.089 to. 0.110 m. Using Joshi's equation, the predicted cumulative oil-production was within a 20% difference for up to 12 months of production for long wells and up to 24 months for short wells. Short wells were defined as those being under 1000 m.