Biotechnology and Bioengineering, Vol.94, No.4, 740-752, 2006
Comparative study of biological nutrient removal (BNR) processes with sedimentation and membrane-based separation
A membrane-enhanced biological phosphorus removal (MEBPR) process was operated in parallel with a conventional EBPR (CEBPR) process under challenging operating conditions to uncover fundamental differences in their ability to remove chemical oxygen demand (COD), nitrogen (N), and phosphorus (P) from municipal waste-water. Both systems exhibited the same potential to achieve excellent soluble-P removal when a favorable COD to P ratio was maintained in the influent. The MEBPR train generated a superior effluent quality when measured as total P. The CEBPR effluent contained significantly lower levels of nitrates due to the extra denitrification occurring in the sludge blanket of the secondary clarifier. The observed sludge yield in the MEBPR system was estimated to be between 0.23 and 0.28 g VSS/g COD, and this was 15% lower than the CEBPR sludge yield. When the influent volatile fatty acids (VFAs) became limiting, the CEBPR train exhibited better performance in the removal of soluble-P, due to the higher observed sludge yield and an overall greater denitrification activity that led to a more efficient use of VFAs in the anaerobic zone. After experiencing a severe deterioration of the biological P activity in both processes, the MEBPR train exhibited faster recovery than the CEBPR side. In this experimental work, it was demonstrated that an MEBPR process can sustain long-term satisfactory bio-P performance at HRTs as low as 7 h. However, the lower sludge yield and the reduced denitrification capacity are two important factors that impact the design of high rate membrane-assisted biological nutrient removal (BNR) processes. (c) 2006 Wiley Periodicals, Inc.
Keywords:enhanced biological phosphorus removal;biological nutrient removal;membrane solids-liquid separation;conventional activated sludge;comparison