학회 | 한국화학공학회 |
학술대회 | 2015년 가을 (10/21 ~ 10/23, 일산 KINTEX) |
권호 | 21권 2호, p.1624 |
발표분야 | 공정시스템 |
제목 | CO2 Transportation and Storage Offshore Process Basic Design Study |
초록 | CO2 transport and injection pilot test in a near-shore domestic Korea basin will be performed. Captured CO2 is designed to be transported to offshore basin by tank truck and ship. Construction and operation will be performed through conceptual design, basic design and detailed design of transport and injection process. Aspen Hysys is used for process simulation from CO2 feed tank for this basic design study. Approximately 10,000 tons per annum of CO2 is design capacity for pilot operation. Purity of CO2 stored in feed tank is about 95%. Pipeline from CO2 feed tank is connected to platform topside process equipments. CO2 will be injected to the basin selected for this pilot test. Flow assurance and risk analysis will be studied based on basic designed process. Detailed design will be performed through this study in the future. Finally, annually 10,000 tons of CO2 capacity will be operated based on this design package. |
저자 | 박명호, 정구선, 김민준, 김용헌 |
소속 | 한국석유공사 |
키워드 | CCS; CO2 수송; CO2 저장; 해양플랜트 |
원문파일 | 초록 보기 |